Control points
What to check, on which products, where and how often - and what happens when it fails.
A control point is a rule: "check this, on these products, at this moment". Checks are then made by themselves on the right documents.
Open Control points > New control point. Only a Quality manager or Admin can add or change them.
What and where
- What to check - such as "Seal intact" or "Shaft diameter".
Where:
- When goods come in - on goods received in Inventory
- Before delivery - on packages and deliveries
- On transfers between warehouses (Standard and up)
- On customer returns (Standard and up)
- During production - on Manufacturing orders; shows only when Manufacturing is on. Only at this step limits it to one step.
- Scheduled audit (not tied to stock) - see Scheduled audits
- Only when someone starts one - never made by itself
- Product, or a product category. Leave both empty to check every product.
Type of check
- Pass or fail
- Measure - with Expected, Lowest allowed, Highest allowed and a Unit. A measure outside the limits fails.
- Instructions - steps to read and confirm
- Take a picture
- Worksheet - your questions, one a line; the inspector answers each one
- Record the lot / serial number
- Register materials and by-products and Print label - for Manufacturing orders
How often
- Frequency - Every time, Randomly (a share of the time, such as 20%), Every so many days, or Only when someone starts one.
- Check - Once per document / order, Once per product or A share of the quantity (such as 10% of what came in).
When it fails
- Message to the inspector - such as "Put the pallet aside and tell the supervisor".
- Move the failed quantity to - a warehouse, such as Quarantine. Standard and up, with Inventory. When this is empty, the quarantine warehouse in Settings > Preferences is used.
Who
- Team and Responsible - the responsible person is told when a check is waiting.
After saving, add Instructions and documents: SOPs, drawings or photos of what good looks like.
Turn off stops new checks; checks already made stay. A control point that already has checks is turned off rather than deleted.