Bills of materials

What goes into each product, steps, versions, putting a BoM in use, and when a BoM changes only through a change order.

A bill of materials (BoM) lists the components of a product and how much of each. Open Bills of materials: the list shows BoMs in use and drafts; Old versions shows the ones replaced by changes.

Make a BoM

  1. Click New BoM.
  2. Choose the Product it makes, and how many one BoM Makes.
  3. Add each component with its quantity and, if some is lost, a scrap %.
  4. Add steps if you like - a name and minutes, and a work centre when you use Manufacturing.
  5. Click Save as draft.

A product can't be one of its own components, and PLM stops a component that already uses the product somewhere in its own BoM (a loop).

Put it in use

Click Put in use. Manufacturing then makes orders from it. A product can have more than one BoM in use.

Changing a BoM

  • Drafts and BoMs of products not yet released change directly: edit and Save.
  • A BoM in use of a released product changes only through a change order: click Change it. See Engineering change orders.

When a change is applied, the new version is in use and the old one becomes an old version. Orders already started keep the version they began with. The BoM page lists every version with the change that made it.

Downloads

On Standard and up, Download gives every BoM in use as a CSV file, one row per component.