Reports
Production, delays, cost, OEE, quality, job work and following a batch or serial number.
Go to Reports. Open a report, choose the dates, and click CSV to download it. A report your plan doesn't include shows a lock.
Production
- Production analysis - what was made, how much, and what it cost, by product.
- Delays - open and finished orders past their deadline, and by how long.
- Allocation - which order has reserved which stock, and who is still short.
- Work orders - expected and real time of each step, with the difference.
- Operators - time worked by each operator and its cost.
Costs
- Cost analysis - planned against real material, labour and overhead on each order.
- Scrap - what was thrown away, why, and what it cost.
- Work in progress - open orders with labour and overhead in unfinished work.
Machines
- OEE - how much of each work centre's time was fully productive. It is worked out from the time recorded and the reasons chosen when work stopped, not read from machines.
- Work centre load - planned hours on each work centre, day by day.
- Maintenance - requests, failures, time between failures and repair time per equipment.
Quality
- Quality - checks done, passed and failed, by control point.
- Quality alerts - alerts by stage, root cause and how long they took to solve.
Subcontracting
- Job work - what is with each job worker and what has come back.
Traceability
Follow a batch or serial number shows what it was made from, and where it went. It comes with Standard and above.
Which plan
- Standard - production reports, cost analysis, scrap and traceability.
- Professional - adds work in progress, work centre load, quality and job work.
- Business - adds OEE and maintenance.