Ellibo Manufacturing for furniture makers

Manufacturing software for furniture makers

A dining table comes in three sizes and four finishes, half your orders are custom, and the polishing is done by someone down the road. Ellibo Manufacturing handles variants, made-to-order work and subcontracting, and shows what each piece really cost.

Start on the Free plan - shop floor operators are free. Works on any device.

BoM - Dining table, 6 seater
Variant: Teak / Walnut finish - makes 1
Teak planks 1 inchScrap 8%2.4 cu ft$14,400
Table legs, turnedSub-assembly4$3,200
Screws, glue, hardware1 set$420
Cutting + joineryCarpentry bench6 h$2,700
Polishing (subcontract)Job charge1$2,500
Material$18,020
Labour + overhead$5,200
Cost each$23,220
Set item cost from this BoM
One BoM for all 12 size and finish variants
Polishing sent to Sunrise Finishers
Sound familiar?

Where furniture margins disappear

Wood is expensive, every piece takes hours, and custom work hides its real cost. Here is where it usually slips.

A BoM for every size and colour

Each size and finish needs its own list, so nobody keeps them up to date and the costs drift apart.

Make one BoM for all variants of an item group. A line can apply only to some variants, such as walnut stain only for the walnut finish.

Custom orders are priced on hope

A customer wants the sofa 20 cm longer, and the quote is a guess. You find out at delivery that it lost money.

Copy the standard BoM, change it, and see material, labour and overhead before you say yes. The finished order shows planned against real.

The polisher has your stock

Tables go out for polishing and upholstery, and nobody is sure how many are still with them.

Subcontract orders send materials on a delivery document, keep them as your stock at the subcontractor, and show what is still with them.

Off-cuts and wastage are ignored

Planks are cut, the off-cuts pile up, and the wood cost on paper never matches the wood that was bought.

A scrap percentage on each component allows for waste, and scrap records what was thrown away and why.

How it works

From a customer order to a delivered piece

  1. The order is placed

    A sales order for a made-to-order item can start its manufacturing order by itself.

  2. Carpentry begins

    Cutting, joinery and assembly appear as steps on the shop floor tablet.

  3. Out for finishing

    The piece goes to the polisher on a subcontract order and comes back at material plus job charge.

  4. Ready to deliver

    The finished piece enters stock at its real cost, ready to invoice.

Made for furniture makers

Built for workshops that make furniture

BoMs for variants

One BoM for all sizes and finishes, with lines that apply only to some.

Sub-assemblies

Legs, frames and drawers with their own BoMs, ordered when they run short.

Subcontracting

Send pieces for polishing or upholstery and track every trip and job charge.

Scrap allowance

Allow for wood lost in cutting, and record what is really thrown away.

Make to order

Sales orders for custom pieces start their own manufacturing orders.

Engineering changes

Change a design on a copy with approvals, without touching orders already running (Business).

See every Manufacturing feature

Day one

Get your first range in

  • Add your most popular range as items with variants.
  • Make one BoM per range, with lines for each finish.
  • Add carpentry, assembly and finishing as work centres.
  • Add your polisher or upholsterer as a vendor and a subcontract BoM.
  • Mark custom pieces as make-to-order.
Start free
Questions

Manufacturing for furniture makers: FAQ

Do I need a separate BoM for each size and colour?

No. For items with variants you can make one BoM for all variants of an item group, and mark lines that are only for some of them.

Can we send work out for polishing or upholstery?

Yes, on Professional and above. A subcontract order sends materials, records what comes back, and makes a bill for the job charge. The product comes in at material plus job charge.

Can I cost a custom piece before I accept it?

Yes. Copy a BoM, change it, and the BoM shows material, labour, overhead and cost each for any quantity before you start.

How do I allow for wood wasted in cutting?

Give the component a scrap percentage. When something is really thrown away, record it as scrap with the reason and cost.

Will the showroom see the new stock?

Finished pieces always show in Inventory and Accounting. Ellibo POS sees them once shared stock is on in POS, usually within about five minutes.

Is there a free plan?

Yes. The Free plan has 2 office users and 30 orders a month. Subcontracting and make-to-order come with Professional, and the 14-day trial has everything.

Make every piece pay its way

Start on the Free plan - shop floor operators are free. Add more apps whenever you are ready.