Every change to your products, under control
Bills of materials with every version kept, change orders approved stage by stage, change requests from anyone, drawings with revisions, and share packs for outside makers.
- Free for 2 users, for ever
- Approvers free on every plan
- 14-day trial, no card
- Approve changes from a phone
Already with Ellibo? Sign in
- Every version of every BoM kept
- Approvals stage by stage
- Approvers free on every plan
- 14-day trial of everything, no card
Uncontrolled changes are expensive
A part swapped without telling purchasing, a drawing that doesn't match the product, a maker working from last year's version - each one ends in scrap or rework.
- Which version is right?
BoMs and drawings live in shared folders and email, with three copies of everything.
One BoM in use, every old version kept with the change that replaced it. - Changes nobody signed off
Someone changes a part on the shop floor, and the rest find out when something breaks.
Changes go through your stages, approved by the right people. - Makers build the old version
Suppliers and contract makers work from whatever was emailed to them last.
Share packs show only what is released, on a private link.
From the first idea to the released product
Start with your products and their BoMs. Change orders, approvals, documents and sharing follow when you are ready.
Change a BoM without breaking production
Start a change order and a copy of the BoM becomes the next version. Change the copy, compare old and new side by side, and move it through your stages. Apply it now or on a date: the new version is in use, the old one stays with the orders that used it. If someone else changed the same BoM first, PLM shows it and moves your changes onto the new version.
- Your own change types and stages
- Old and new compared, part by part
- Applied now or on a date, by itself
- Every version kept with the change that made it
The right people say yes before anything changes
Each stage can name the people who must approve it - engineering, purchasing, quality. They get a notice, approve or reject with a reason on their phone, and the change can't move on until they have. Anyone in the team can raise a change request; an engineering manager turns it into a change order or says why not.
- Approvers per stage
- Reject with a reason, then approve again
- Change requests from anyone
- Approvers are free on every plan
One true list of what goes into each product
Products move from concept to design, prototype, released and obsolete. Once released, a product's BoM changes only through a change order, and each applied change gives it its next revision. See where every part is used, and warnings when an obsolete part is still in a BoM.
- Lifecycle stages and revisions
- Where each part is used
- Steps with minutes, for Manufacturing
- Downloads of every BoM
Drawings that match the product, and no surprises
Keep drawings, specifications, CAD files and manuals with revision letters. A new revision is released with its change order and replaces the old one. Before you apply a change, see its impact: where the product is used, open orders on the BoM, and the stock and purchases of the parts that change. Note approved makers and alternate parts for each part.
- Revisions A, B, C or 1, 2, 3
- PDF, DXF, DWG, STEP and more
- Impact: orders, stock, purchases
- Approved and alternate parts
Names and figures in these pictures are examples.
Put your first BoM under control today
Free for 2 users, Approvers free. Try every feature for 14 days, no card.
Shared folders and email, or Ellibo PLM
| Shared folders and email | Ellibo PLM | |
|---|---|---|
| The current BoM | Whichever file was saved last | One BoM in use, every version kept |
| Making a change | Edit the file and hope | Change a copy, compare old and new, then apply |
| Sign-off | A reply-all "looks fine" | Approvers per stage, recorded |
| Before you change | Guess what it affects | Where used, open orders, stock and purchases |
| Drawings | final_v3_NEW.pdf | Revisions released with the change |
| Outside makers | Attachments in an email | A private link to what is released, that you can turn off |
Running in an afternoon
- Add your products and BoMs
Those you make in Manufacturing are there already.
- Set your change stages
The steps a change goes through, and who approves each.
- Change with change orders
On a copy, approved, applied as the next version.
One business, one set of data
Each link shows only when you use that app.
Everyone sees what they need
Every change is checked against the person's role, and the audit log shows who changed what.
Everything: products, BoMs, changes, documents, settings, users and the plan.
Change types, applying changes, releasing products, share packs.
Change orders, BoMs, documents and alternate parts.
Approves the changes they are asked to and raises requests. Free on every plan.
Sees products, BoMs, changes and documents. Custom roles from Professional.
For every business that designs what it makes
- Manufacturers
BoM changes approved before they reach the shop floor.For example: pumps, machines, auto parts
- Electronics
Part changes and alternates with makers' part numbers.For example: boards, controllers, devices
- Consumer products
Revisions and drawings for every model.For example: appliances, tools, toys
- Furniture and fixtures
Cut lists and drawings shared with workshops.For example: furniture, shop fittings
- Brands with contract makers
Share packs with the released details only.For example: private labels, start-ups
- Process makers
Recipe and formula versions under control.For example: cosmetics, food, chemicals
A price a user, Approvers free
Prices are a user a month, before tax. A year costs the same as 10 months.
Free
Standard
Professional
Business
Questions people ask
What is Ellibo PLM?
It is product lifecycle management software: your products with their lifecycle stage and revision, bills of materials and every version of them, engineering change orders that change a BoM on a copy and get approved stage by stage, change requests from anyone in the team, documents such as drawings and specifications with revisions, approved and alternate parts, and share packs for outside makers. It works with Ellibo Manufacturing, Inventory and Quality.
Is there a free plan?
Yes. The Free plan covers 2 users with products and BoMs, change orders and change requests - for as long as you like. Approvers are free on every plan. Every new business also gets a 14-day trial of every feature, with no card.
Do I need Ellibo Manufacturing?
No. PLM has its own screens for products and bills of materials, so a design team can work in PLM alone. With Manufacturing, the BoMs are the same ones your orders are made from: a change applied in PLM is the version the next order uses, and orders already started keep the version they began with.
How does a change order work?
Make the change order and start the work: a copy of the BoM is made as the next version. Change the copy and compare old and new. The change moves through your stages, and the people you choose approve each stage. Apply it - now or on a date - and the new version is in use, the product gets its next revision, the change's documents are released, and everyone on it is told.
Can people outside the business see our drawings?
Only what you choose. A share pack is a private link with a product's released BoM and the released documents you pick, for as many days as you set. You see when it was opened, and you can turn it off at any time.
Who counts as a user?
Admins, engineering managers, engineers and viewers count. Approvers, who approve the changes they are asked to and raise change requests, are free - as are outside makers opening a share pack.
What does it cost, and what happens after the trial?
Standard is $8 a user a month before tax, Professional is $16 and Business is $24. Approvers are free. A year costs the same as 10 months. After the 14-day trial you move to the Free plan or the plan you choose. Nothing is deleted.
Want the details? Read the PLM help guides.
Change your products with confidence
Free for 2 users, for ever. Approvers free. 14 days of everything, no card.